Health
& Safety Information for O&M
Demo Project
123 Test Road
Hastings
East Sussex
TN38 9UH
Start Date: 01/01/2025
End Date 01/01/2025
Manuals Compiled by
Contents of Health & Safety File
Navigation hints
· You should have a ‘Document Map’ to the left of this page. If it is not showing it is probably because you refused to accept the Macro when you opened the file. Go to menu above: View > Show > Navigation Pane / Document Map
· The headings listed in the Document Map on the left link to the correct part of the document - simply click on the heading in which you are interested.
· The Content list below also links with a click.
· Throughout this document there are links to other separate documents – these are marked as blue and underlined. When clicking on these links the new document will be opened leaving the current document open underneath.
Health & Safety Information for O&M
Contents of Health & Safety File
2. Post Contract Works & Amendment Control
3.3. Sub Contractors Directory
4.2. Project Location / Address
5. Design Criteria / Specifications
7.2. Building Regulation Approvals
7.3. Building Control Correspondence
8. Removal / Dismantling of the Installed Plant & Equipment
8.2. Special Access / Plant Lifting Strategy
9. The Nature, Location and Markings of Significant Services
10. Residual Hazards & Hazardous Materials
10.1. Designers Risk Assessments
11. H&S Information of Equipment provided for Cleaning and Maintenance
11.1. Access & Maintenance Strategies
11.2. Man-safe Systems / Certification and Details
12. Fire and Emergency Information
12.1. Emergency Service Shut-Off Locations
1. Introduction
The manuals should be consulted whenever necessary, as they contain essential information intended to allow enable future construction work and maintenance to be carried out safely. “Construction Work” is widely defined and includes activities such as cleaning, maintenance, alternations, refurbishment and demolition of structures.
The following people may in future need to be alerted to the risks highlighted in this file to help them decide how to ensure safety:
• Clients (e.g. property owners or occupiers) who have a duty to provide information about their premises to people who work there;
• Designers, during the development of further designs or alterations;
• Principal contractors and contractors preparing to carry out or manage such work;
• Maintenance managers and personnel.
The information relevant to construction health and safety is required by law to be kept up to date by the client after any relevant work or surveys and passed on to any new owners of the property. The amount of detail should be in proportion to the scale and complexity of the risks.
Caution: When planning work, always take into account the possibility of changes since the file was prepared, such as:
• Undocumented changes to the building, plant or services;
• Developments or changes nearly that may have affected risks;
• New evidence, guidance or legislation on hazards and precautions
The Health & Safety File is designed to hold all relevant information in relation to this project.
Details of the ongoing maintenance of all the components are also contained within this manual.
2. Post Contract Works & Amendment Control
2.1. File Maintenance
The information in this Health and Safety File should only be amended, updated or added to, following careful consideration. A complete history of revisions made should be kept in this document.
The person or persons responsible for keeping and maintaining this Health and Safety File should ensure that the information contained within it is clearly presented, legible and accessible. The File should also form an integral part of any system established in accordance with current legislation for ensuring health and safety.
Alterations or amendments to this File should only be carried out by authorised persons and should be noted on the Record of Amendments Sheet. Any drawing/information, which has been superseded, should be noted on the amendment Control Sheet. Any information appertaining to fittings or equipment removed from the structure should also be noted. The File should be audited and consolidated at regular intervals by any authorised person who is duly qualified, so that the information contained is complete and fulfils the intent of the Construction (Design and Management) Regulations 2015.
2.2. Record of Amendments
Date |
Detail of Amendment and Section Amended |
Reason for Amendment |
Signature |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3.

Contract Directory
3.1. Client Project Team
Role |
Company |
Address |
Contact |
Telephone / Email |
Client |
Company Name |
1st line of address 2nd line of address Town postcode |
Name Here |
T: 00000 000 000 F: 11111 111 111 M: 22222 222 222
|
3.2. Project Team Directory
Company |
Address |
Contact |
Telephone / Email |
|
Project Manager |
Company Name |
1st line of address 2nd line of address Town postcode |
Name Here |
T: 00000 000 000 F: 11111 111 111 M: 22222 222 222
|
Assistant Project Manager |
Company Name |
1st line of address 2nd line of address Town postcode |
Name Here |
T: 00000 000 000 F: 11111 111 111 M: 22222 222 222
|
Project Director |
Company Name |
1st line of address 2nd line of address Town postcode |
Name Here |
T: 00000 000 000 F: 11111 111 111 M: 22222 222 222
|
Building Control |
Company Name |
1st line of address 2nd line of address Town postcode |
Name Here |
T: 00000 000 000 F: 11111 111 111 M: 22222 222 222
|
3.3. Sub Contractors Directory
3.3.1. Building Fabric
Building Fabric O&M Information
Trade |
Sub-Contractor |
Address |
Contact Details |
Telephone / Email |
Acoustic Plant Enclosure |
Company Name |
1st line of address 2nd line of address Town postcode |
Name Here |
T: 00000 000 000 F: 11111 111 111 M: 22222 222 222
|
Carpets and Stair Nosings |
Company Name |
1st line of address 2nd line of address Town postcode |
Name Here |
T: 00000 000 000 F: 11111 111 111 M: 22222 222 222
|
Decorations |
Company Name |
1st line of address 2nd line of address Town postcode |
Name Here |
T: 00000 000 000 F: 11111 111 111 M: 22222 222 222
|
Fabrication – Including Terrace Fence, Balustrade and Staircase Modification |
Company Name |
1st line of address 2nd line of address Town postcode |
Name Here |
T: 00000 000 000 F: 11111 111 111 M: 22222 222 222
|
Façade Cleaning |
Company Name |
1st line of address 2nd line of address Town postcode |
Name Here |
T: 00000 000 000 F: 11111 111 111 M: 22222 222 222
|
Glazing including new roof light |
Company Name |
1st line of address 2nd line of address Town postcode |
Name Here |
T: 00000 000 000 F: 11111 111 111 M: 22222 222 222
|
Mansafe System |
Company Name |
1st line of address 2nd line of address Town postcode |
Name Here |
T: 00000 000 000 F: 11111 111 111 M: 22222 222 222
|
Man Hole Covers and Frames |
Company Name |
1st line of address 2nd line of address Town postcode |
Name Here |
T: 00000 000 000 F: 11111 111 111 M: 22222 222 222
|
3.3.2. Mechanical Services
Trade |
Sub-Contractor |
Address |
Contact Details |
Telephone / Email |
Mechanical and plumbing, ventilation, domestic |
Company Name |
1st line of address 2nd line of address Town postcode |
Name Here |
T: 00000 000 000 F: 11111 111 111 M: 22222 222 222
|
Underfloor Heating |
Company Name |
1st line of address 2nd line of address Town postcode |
Name Here |
T: 00000 000 000 F: 11111 111 111 M: 22222 222 222
|
3.3.3. Electrical Services
Trade |
Sub-Contractor |
Address |
Contact |
Telephone / Email |
Access Control |
Company Name |
1st line of address 2nd line of address Town postcode |
Name Here |
T: 00000 000 000 F: 11111 111 111 M: 22222 222 222
|
Electrical Works, Emergency Systems |
Company Name |
1st line of address 2nd line of address Town postcode |
Name Here |
T: 00000 000 000 F: 11111 111 111 M: 22222 222 222
|
Roller Shutter |
Company Name |
1st line of address 2nd line of address Town postcode |
Name Here |
T: 00000 000 000 F: 11111 111 111 M: 22222 222 222
|
4. Project Scope
4.1. Brief Works Description
This would be a brief description of what the whole of the projects works would be carried out.
4.2. Project Location / Address
Oktra Training Manual
4.3. Project Dates
Start Date: 01/01/2023
End Date: 01/01/2023
5.
Design Criteria / Specifications
5.1. Architect.............................................................................................................................................................. 11
5.1.1. Specifications........................................................................................................................................... 11
5.1.2. Design Drawings...................................................................................................................................... 11
5.2. Services Engineers............................................................................................................................................. 11
5.2.1. Specifications........................................................................................................................................... 11
5.2.2. Design Drawings...................................................................................................................................... 11
5.3. Structural Engineers.......................................................................................................................................... 12
5.3.1. Specifications........................................................................................................................................... 12
5.3.2. Design Drawings...................................................................................................................................... 12
5.4. Civil Engineers..................................................................................................................................................... 12
5.4.1. Specifications........................................................................................................................................... 12
5.4.2. Design Drawings...................................................................................................................................... 12
5.5. Interior Designers.............................................................................................................................................. 13
5.5.1. Specifications........................................................................................................................................... 13
5.5.2. Design Drawings...................................................................................................................................... 13
5.1. Architect
5.1.1. Specifications
Description |
Specification |
ARCHITECTURAL SPECIFICATION |
5.1.2. Design Drawings
Drawing Number |
Drawing Title |
Rev |
Issue Date |
Checked |
ARCH-001 |
Architect Drawings 1 |
AB |
01/01/2023 |
LD |
ARCH-002 |
Architect Drawings 2 |
AB |
01/01/2023 |
LD |
ARCH-003 |
Architect Drawings 3 |
AB |
01/01/2023 |
LD |
ARCH-004 |
Architect Drawings 4 |
AB |
01/01/2023 |
LD |
ARCH-005 |
Architect Drawings 5 |
AB |
01/01/2023 |
LD |
5.2. Services Engineers
5.2.1. Specifications
Description |
Specification |
SERVICE ENGINEERS SPECIFICATION |
5.2.2. Design Drawings
Drawing Number |
Drawing Title |
Rev |
Issue Date |
Checked |
SER-E-001 |
Electrical Drawing 1 |
AB |
01/01/2023 |
LD |
SER-E-002 |
Electrical Drawing 2 |
AB |
01/01/2023 |
LD |
SER-E-003 |
Electrical Drawing 3 |
AB |
01/01/2023 |
LD |
SER-M-001 |
Mechanical Drawing 1 |
AB |
01/01/2023 |
LD |
SER-M-002 |
Mechanical Drawing 2 |
AB |
01/01/2023 |
LD |
5.3. Structural Engineers
5.3.1. Specifications
Description |
Specification |
STRUCTURAL ENGINEERS SPECIFICATION |
5.3.2. Design Drawings
Drawing Number |
Drawing Title |
Rev |
Issue Date |
Checked |
STRU-001 |
Structural Drawing 1 |
AB |
01/01/2023 |
LD |
STRU-002 |
Structural Drawing 2 |
AB |
01/01/2023 |
LD |
STRU-003 |
Structural Drawing 3 |
AB |
01/01/2023 |
LD |
STRU-004 |
Structural Drawing 4 |
AB |
01/01/2023 |
LD |
STRU-005 |
Structural Drawing 5 |
AB |
01/01/2023 |
LD |
5.4. Civil Engineers
5.4.1. Specifications
Description |
Specification |
CIVIL ENGINEERS SPECIFICATION |
5.4.2. Design Drawings
Drawing Number |
Drawing Title |
Rev |
Issue Date |
Checked |
CIV-001 |
Civil Drawing 1 |
AB |
01/01/2023 |
LD |
CIV-002 |
Civil Drawing 2 |
AB |
01/01/2023 |
LD |
CIV-003 |
Civil Drawing 3 |
AB |
01/01/2023 |
LD |
CIV-004 |
Civil Drawing 4 |
AB |
01/01/2023 |
LD |
CIV-005 |
Civil Drawing 5 |
AB |
01/01/2023 |
LD |
5.5. Interior Designers
5.5.1. Specifications
Description |
Finishes Schedule |
INTERIORS DESIGN SPECIFICATION |
6.
As Built Drawings
6.1. Package 1............................................................................................................................................................. 14
6.2. Package 2............................................................................................................................................................. 14
6.3. Package 3............................................................................................................................................................. 14
6.4. Package 4............................................................................................................................................................. 14
6.5. Package 5............................................................................................................................................................. 15
6.6. Package 6............................................................................................................................................................. 15
6.7. Package 7............................................................................................................................................................. 15
6.8. Package 8............................................................................................................................................................. 15
6.9. Package 9............................................................................................................................................................. 16
6.10. Package 10..................................................................................................................................................... 16
6.11. Package 11..................................................................................................................................................... 16
6.1. Package 1
Drawing Number |
Drawing Title |
Rev |
Issue Date |
Checked |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.2. Package 2
Drawing Number |
Drawing Title |
Rev |
Issue Date |
Checked |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.3. Package 3
Drawing Number |
Drawing Title |
Rev |
Issue Date |
Checked |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.4. Package 4
Drawing Number |
Drawing Title |
Rev |
Issue Date |
Checked |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.5. Package 5
Drawing Number |
Drawing Title |
Rev |
Issue Date |
Checked |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.6. Package 6
Drawing Number |
Drawing Title |
Rev |
Issue Date |
Checked |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.7. Package 7
Drawing Number |
Drawing Title |
Rev |
Issue Date |
Checked |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.8. Package 8
Drawing Number |
Drawing Title |
Rev |
Issue Date |
Checked |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.9. Package 9
Drawing Number |
Drawing Title |
Rev |
Issue Date |
Checked |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.10. Package 10
Drawing Number |
Drawing Title |
Rev |
Issue Date |
Checked |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.11. Package 11
Drawing Number |
Drawing Title |
Rev |
Issue Date |
Checked |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7. Statutory Approvals
7.1. Planning Approvals
Description |
Approval |
|
|
7.2. Building Regulation Approvals
Description |
Approval |
|
|
7.3. Building Control Correspondence
Description |
Approval |
|
|
8. Removal / Dismantling of the Installed Plant & Equipment
8.1. Major Plant Replacement
Description |
Strategy |
|
|
8.2. Special Access / Plant Lifting Strategy
Description |
Strategy |
|
|
8.3. Demolition Criteria
Description |
Waste Consignment Notes |
|
|
9. The Nature, Location and Markings of Significant Services
9.1. Incoming Services
The property has been built/modified to incorporate the following incoming services:
- Electrical
- Gas
- Water
- Telecoms
- Other
9.2. Service Isolation Points
The following isolation points have been installed and can be located within the services cabinet:
- Electrical
- Gas
- Water
- Other
To be read din conjunction with As Built Drawings
10. Residual Hazards & Hazardous Materials
10.1. Designers Risk Assessments
Description |
Designers Risk |
|
|
10.2. Residual Hazards
10.3. Hazardous Materials
Description |
Safety Datasheet/COSSH |
|
|
|
|
|
|
|
|
10.4. Asbestos
Description |
Report |
|
|
11. H&S Information of Equipment provided for Cleaning and Maintenance
11.1. Access & Maintenance Strategies
Description |
Fire Strategy |
|
|
11.2. Man-safe Systems / Certification and Details
1. Description of Item |
|
Colour/Code/Ref/Batch number/ |
|
Location
|
|
Manufacturer Contact details |
|
Manufacturers Literature |
[Man Lit] |
Description |
Fire Strategy |
|
|
12. Fire and Emergency Information
12.1. Emergency Service Shut-Off Locations
Refer to Section 9.2 Service Isolation Points.
12.2. Fire Strategy
Description |
Fire Strategy |
|
|
Drawing Number |
Drawing Title |
Rev |
Issue Date |
Checked |
|
|
|
|
|
12.3. Fire Fighting Systems
The following Fire Systems have been installed and can be located in the following Vol/Section
Fire Safety Doors – Architectural Vol 2 Section x.x
Sprinklers - Mechanical Vol 3 Section x.x
Fire Alarms – Electrical Vol 4 Section x.x
13. Emergency Numbers
Numbers below are provided for your information only; Always dial 999 in the event of an emergency / Dial 112 from Mobile Phones.
Nearest A&E Hospital
Hospital
1st line of address
2nd line of address
Town
postcode
Police
Police Station
1st line of address
2nd line of address
Town
postcode
Fire Brigade
Fire Brigade Station
1st line of address
2nd line of address
Town
postcode
14. Warranties
Works
All Works are covered under the Contract’s 12 months defects period for installations and equipment
Supplementary to this Standard cover and as required by the Contract or the Employer the following can be implemented:
Collateral Warranties
If requested by the Employer or under the Contract we will execute and deliver to the client or named beneficiaries a deed or deeds of Collateral Warranty.
CDP Works
Under the terms of the Contract where it is required that each relevant Subcontracts is to supply a deed of Collateral Warranty to the Employer or as requested by the Employer to the Employer’s beneficiary
15. Other Information